Before a kitchen remodel, set a budget with a 10 to 20 percent contingency, decide whether the layout is changing, choose cabinets, counters, flooring and appliances, confirm permits, and plan a temporary kitchen. Finalizing selections before work starts is the best way to avoid delays.
A kitchen remodel goes smoothly when most decisions are made before demolition. Use this checklist to plan.
1. Set your budget and contingency
Decide what you're comfortable spending, then hold back 10 to 20 percent for surprises like damaged subfloor or outdated wiring behind the walls.
2. Decide on the layout
Keeping the sink, range and fridge where they are saves money. Moving plumbing, gas or walls adds cost and time but can transform how the kitchen works.
3. Make your main selections
- Cabinets: stock, semi-custom or custom
- Countertops: quartz, granite, butcher block or laminate
- Flooring that can handle spills
- Appliances, with exact dimensions
- Sink, faucet, lighting and backsplash
4. Plan the details people forget
- Enough outlets, including on the island
- Under-cabinet lighting
- Trash and recycling pull-outs
- Range hood that vents outside
5. Permits
Electrical, plumbing and structural changes usually require permits from your city or county. Your contractor should know the local requirements in your area.
6. Set up a temporary kitchen
A microwave, coffee maker, mini fridge and a folding table in another room make weeks without a kitchen much easier.
7. Agree on a schedule
Ask your contractor for a written timeline and when each selection must be final so materials arrive on time.
Planning a kitchen remodel?
We'll walk your space, talk through layout and budget, and give you a clear plan and timeline. Book a free call and we'll talk through your project and next steps.
Frequently asked questions
How long does a kitchen remodel take?
A cosmetic update can take a few weeks. A full remodel often takes six to twelve weeks of construction, plus planning and material lead times.
Do I need a permit for a kitchen remodel?
Work involving electrical, plumbing or structural changes usually requires a permit from your local building department. Cosmetic changes often don't.
What is a good contingency for a remodel?
Setting aside 10 to 20 percent of the budget is a common rule of thumb to cover surprises found once walls and floors are opened.