A cosmetic bathroom update often takes one to two weeks. A full remodel with new plumbing, tile and fixtures usually takes three to six weeks of construction. Special-order materials and permit inspections are the most common causes of delays.
Bathrooms are small, but they pack in plumbing, electrical, waterproofing and tile, all of which happen in sequence. Here is a typical timeline.
Typical stages of a full remodel
- Demolition (1 to 3 days): removing fixtures, tile and drywall.
- Rough plumbing and electrical (2 to 5 days): moving drains, supply lines, wiring and fans.
- Inspection: if permits are required, work pauses until the inspector signs off.
- Waterproofing and drywall (2 to 4 days): cement board, membranes and moisture-resistant drywall.
- Tile (3 to 7 days): floors, shower walls and niches, plus grout curing time.
- Vanity, fixtures and finishes (2 to 4 days): toilet, vanity, glass, mirrors, lighting and paint.
What causes delays
- Custom vanities, glass or tile with long lead times
- Water damage or rot found behind old tile
- Changes to the plan once work has started
- Inspection scheduling
How to keep it on schedule
Make every selection before demolition and have materials on site before work begins. If you only have one bathroom, ask your contractor to plan the order of work to keep a working toilet as long as possible.
Ready to redo your bathroom?
We'll help you plan selections up front so your remodel stays on schedule. Book a free call and we'll talk through your project and next steps.
Frequently asked questions
Can I use my bathroom during a remodel?
Usually not during a full remodel. If it's your only bathroom, ask your contractor how to sequence the work to minimize downtime.
What is the longest part of a bathroom remodel?
Tile work is often the longest stage because of setting and grout curing times, along with waiting on special-order materials.
Does a bathroom remodel need a permit?
Moving plumbing or adding electrical circuits usually requires a permit. Replacing fixtures in the same place often doesn't, but check with your local building department.