A kitchen remodel has two phases: planning (design, choices, ordering and permits) and construction. A cosmetic refresh can take a few weeks, while a full remodel that moves walls, plumbing or electrical often takes a couple of months of construction or more. Every project is different, so ask for a schedule based on your scope.
Kitchens are one of the most popular remodels, and one of the most common questions is how long you'll be without one. The honest answer: it depends on the scope. Here's how the timeline usually breaks down.
Phase 1: Planning And Design
This is where you decide the layout, cabinets, countertops, appliances, lighting and finishes. The more decisions you make before demolition, the smoother construction goes. Changing your mind mid-project is one of the biggest causes of delays.
Phase 2: Ordering Materials
Cabinets, specialty appliances and custom countertops can have lead times of several weeks. A good contractor orders long-lead items early so the crew isn't waiting once walls are open.
Phase 3: Permits
If the remodel moves plumbing, gas, electrical or walls, expect a permit. Review time varies, so it's built into the schedule before construction starts.
Phase 4: Construction
A typical construction sequence looks like this:
- Protection and demolition.
- Rough framing, plumbing, electrical and ventilation.
- Inspections.
- Insulation, drywall and paint.
- Cabinets, then countertop templating and installation.
- Backsplash, flooring, fixtures and appliances.
- Final inspection and punch list.
What Makes A Kitchen Remodel Take Longer?
- Moving the sink, range or walls.
- Surprises behind the walls, like old wiring or water damage.
- Late material choices or back-ordered items.
- Changes to the plan once work has started.
How Do You Keep It On Schedule?
Finalize selections early, keep one point of contact, and ask for a written schedule with milestones. Projects change to match what's found on site sometimes; what matters is that your contractor tells you right away and explains the options.
Can You Live At Home During A Kitchen Remodel?
Most people do. Setting up a temporary kitchen with a microwave, a small fridge and a utility sink makes the weeks much easier.
Thinking About A New Kitchen?
Tell us about your kitchen and we'll map out a realistic plan and schedule. Book a free call and we'll talk through your project and next steps.
Frequently Asked Questions
What is the longest part of a kitchen remodel?
Often it's planning and waiting on materials like cabinets and countertops. Finalizing choices early shortens the overall timeline.
Does a kitchen remodel need a permit in Portland?
If you move plumbing, gas, electrical or walls, it usually does. Cosmetic updates often don't. Confirm with the city for your scope.
Can the schedule change once work starts?
Yes. Hidden issues behind walls can change the plan. A good contractor tells you right away and explains your options.